Handover template

A handover note passes responsibility for live work from one person to another: what's in progress, what's gone wrong, what could go wrong next, who to call, and which access, keys or equipment change hands. This free Word template works for a shift handover, for cover while someone is on holiday, and for handing over a job when someone moves role or leaves, with sign-off by both people.

Download the Word template

Word (.docx) · 38 KB · free, no sign-up

Running a company of 30 to 200 people? Documents like this are now worth money.

The note is half of a handover; the other half is talking it through, so questions get asked while the person handing over is still there to answer them.

What's in the template

Handover note

Handed over byName and role
Taken over byName and role
Type of handoverShift, holiday or absence cover, or leaving or changing role
Date and time 
Coverse.g. the night shift, two weeks from 3 November, or permanent
Manager 

1. Read this first

The three things the person taking over must know before anything else.

#WhatWhy it mattersBy when
1   
2   
3   

2. Work in progress

Task, job or orderWhere it's up toNext stepDeadlineFiles or location
     
     
     
     

3. Open issues

IssueSinceWhat's been triedIf it gets worse
    
    
    

4. Risks and safety

Equipment out of use or locked off, temporary workarounds, permits in force, customers likely to complain, deadlines at risk.

Risk or warningPrecautions in placeWho to tell
   
   
   

5. Regular duties and dates

For holiday cover and job handovers: the routines that fall due while the new person is responsible.

DutyHow oftenNext dueHow to do it (SOP or notes)
    
    
    

6. Contacts

NameOrganisation or teamHelps withHow to reach them
    
    
    

7. Access, keys and equipment

Never write passwords here. List what changes hands and how; system access moves through IT.

Item (system, key, card, equipment)Held by nowTransferred toDone (date)
    
    
    

8. Leaving or changing role: extra checks

  • Shared files moved out of personal drives and inboxes
  • Customers, suppliers and colleagues told who their new contact is
  • Shadowing sessions held before the last day
  • Email auto-reply and forwarding agreed with the manager
  • IT told which access ends on the last day

9. Questions raised at the handover

QuestionAnswer or follow-upWho
   
   

10. Sign-off

RoleNameSignatureDate and time
Handed over by   
Taken over by   
Manager (job handovers)   

How to hand over well

  1. Prepare the note before the handover, not during it. For a shift that means the last half hour; for a job, start in the first week of notice.
  2. Lead with the three things that matter most (section 1). Someone taking over a busy shift may read nothing else for an hour.
  3. Hand over face to face where you can, and walk the area at a shift change: looking at the machine that's playing up beats reading about it.
  4. Ask the person taking over to say back what they've understood and to question anything unclear. HSE's guidance describes good shift handover as two-way, with both people sharing responsibility for it, and backed by written as well as spoken communication.
  5. Sign it off together, with the time, so it's clear when responsibility changed hands.
  6. For a job handover, overlap and follow up. Book shadowing before the last day, introduce the successor to key contacts in person, and have the manager ask a week later what the note missed.

Shift handover or job handover?

Shift handoverHoliday or absence coverLeaving or changing role
Time to prepareMinutesA day or twoWeeks
FocusLive status: faults, safety, what's runningDeadlines and decisions that can't waitRelationships, routines, knowledge and access
Sections to stress1, 3 and 41, 2 and 52, 5, 6, 7 and 8
AfterwardsThe next handover picks up the threadA short handback on returnA check-in with the manager a week or two later

If a role's handover keeps running to pages of how-to, those steps belong in SOPs that outlast any one person. For roles nobody could step into at short notice, start a succession plan.

Example: a night-to-day shift handover

Sections 1 and 4 of a handover at a fictional 130-person plastics moulding factory, written by the night shift leader at 05:45:

ItemDetailAction for the day shift
Machine 7 mould changeNew tool clamped in; cooling water not yet connectedFinish the change and pass a first-off check before running
Chiller 2High-temperature alarm at 03:10 and 04:40; machines 5 and 6 moved to chiller 1Refrigeration engineer due at 09:00; meet them at the plant room
Machine 12Locked off by the maintenance fitter for a hydraulic leakLeave the lock on; only maintenance removes it
Order for the 10:00 collection1,400 of 2,000 caps packed; the rest running on machine 3Finish and label by 09:30

The day shift leader read it back, asked where the chiller alarm log was kept, and both signed at 06:05. When the factory's buyer left a month later, her handover leaned instead on sections 5 to 7: routine supplier calls, account contacts and ordering system access.

Common mistakes

  • A note left on the desk with no conversation, so nobody can ask what "keep an eye on M12" means.
  • Only good news. Faults and near misses are what the next person most needs to hear.
  • Vague status, such as "nearly done". Say what's finished and what the next step is.
  • Passwords written in the note. Move access through IT or your password manager instead.
  • A job handover squeezed into the last afternoon. Start early in the notice period, while the leaver still has time to answer questions.

Frequently asked questions

What should a handover document include?

Work in progress and its next steps, open issues, risks and safety warnings, regular duties coming up, key contacts, and the access or equipment changing hands, followed by sign-off from both people with the date and time.

How long should a shift handover take?

As long as it needs, which varies from shift to shift. HSE's guidance says handover should be given as much time and resource as necessary, so build an overlap into the rota rather than expecting it to happen at the door.

What happens to a leaver's access?

It should be removed, or passed to the right person, as part of your leavers process. The NCSC recommends a joiners, movers and leavers policy, so access can be revoked when it's no longer needed and changed when someone moves role. Section 7 records what changes hands.